Featured

Subsidy for Solar system installation



Office in Japan

The solar-power business is expanding quickly in Japan., helping lift the cloud that has surrounded the industry.

You can apply 3 different government subsidies

Federal government subsidy

Solar system installation cost per 1kw Subsidy per 1kw power generation
¥35k~¥475k ¥35k
¥475k~¥550k ¥30k

Top 5 Solar subsidy prefecture※

1. Nagano ¥500,000/1 installation maximum:¥500,000

2. Tokyo ¥100,000/1kw maximum:¥1,000,000

3. Fukushima ¥50,000/1kw maximum:¥495,000

4. Iwate ¥48,000/1kw maximum:¥480,000

5. Nara ¥100,000/1 installation maximum:¥100,000

※Every prefecture government has own subsidy criteria. If you need to help, feel free ask us

City,ward subsidy※

Shinjuku-ward(Tokyo) ¥100,000/1kw maximum:¥300,000

Karuizawa ¥100,000/1kw maximum:¥400,000

※there are thousands of cities,ward,and other. therefore pick up major subsidy in here

Sample model

If you live in Shinjuku-ward Tokyo, your available subsidy will be following

ex:Maximum power of generation 3.0kw

3.0*35k(cost under ¥475k per 1kw)+3.0*100K+3.0*100k=¥705k

If you live in Karuizawa Nagano, your available subsidy will be following

ex:Maximum power of generation 3.0kw

3.0*35k(cost under ¥475k per 1kw)+500k+3.0*100k=¥905k

Practical use subsidy make your cost down

See Previous Posts